APEX Solutions

Blog

More Movember

Posted by Robert Pilcher

Only 9 days to go. The facial hair is starting to irritate a bit, but the fact that we have now hit £300 makes it worth it.

We don't have a photo of Steve today - he has been in hiding in his surgery. He didn't even make it for afternoon coffee!

We do have one of my ugly mug to compare with last week


Movember

Posted by Robert Pilcher

Well the Blog is back. It was removed from the website for a few months as it was just generating spam.

About a month ago, I mentioned in passing that I was considering doing Movember (It's all Chris Evans fault on Radio 2. He mentioned it on his morning show as I was driving in from Cambridge). This was latched upon by the girls at Bury and suddenly it was set in stone and Mr Little and I were signed up. None of the girls wanted to join us!

So now we are a week in and it is itching like, well, ltchiness itself. Especially under a mask. Mr Little has gone for moustache, but my wife insisted I went for full set after a few days of moustache only. I wish I hadn't listened, as my beard is coming through white. My wife thinks she is growing her own Santa.

 One week in we have raised over £100, so thank you all the patients who have donated. It is a bit like being an old fashioned exhibit at a travelling show - £1 entry to see the bearded man!

Mr Pilcher

 

Mr Little's Moustache

 

Woolpit Moustaches

 

 


Rebuild complete

Posted by Robert Pilcher

The rebuild of Mr Pilcher's Surgery is now completed as the photos below show. Mr Pilcher has bought a Castellini Skema 8 operating unit - Their top of the range unit - and cabinetry by Tavom. Both these are Italian, as shows in their fantastic design. These were supplied and fitted by RPA Dental based in Wigan - a specialist Dental Surgery design and fitting company. Building work was carried out AM Building Ltd who have ben working with RPA for 25 years. Mr Pilcher is 'over the moon' with the new surgery.

 

 

 

 

 

 

 



Mon 22nd April Surgery Build

Posted by Robert Pilcher

There have been big noticeable changes today as the cabinets went in today and the templates for the work surfaces and desk areas were made. The corian work surfaces will be installed next monday.

 

Templates for work surfaces

 

 



Refurbishment continues

Posted by Robert Pilcher

Here are the latest photos from the rebuild of Mr Pilcher's surgery. There has been a lot of work carried out by the building team today, although most of it is unseen being first fit of all the electricals and plumbing. A top skim of plaster went on today, and the final fitting of the air conditioning.

Neat fitting of Air Con.

Hard at work